“Your Business Solutions Provider. Together, We rise”

Project Profile · Barrio Talaga, Tanauan, Batangas

Built for what keeps moving.

A large-scale integrated industrial and logistics development — combining a cold chain logistics park and a standard factory building industrial park across more than 1,000,000 square meters.

 

1,001,815

SQM Combined Land Area

2

Integrated Development Phases

12

Storey Office & Apartment Towers

₱15.06B

Phase I Est. Construction Budget

Phase I — Cold Chain Logistics Park Phase II — Standard Factory Building Industrial Park Barrio Talaga, Tanauan, Batangas 1,001,815 SQM Combined Land Area Cold-Chain Storage & Industrial Operations Phase I — Cold Chain Logistics Park Phase II — Standard Factory Building Industrial Park Barrio Talaga, Tanauan, Batangas 1,001,815 SQM Combined Land Area Cold-Chain Storage & Industrial Operations

Project Overview

“A large-scale integrated industrial and logistics project, composed of two major development phases.”

The proposed development brings cold-chain storage, industrial operations, commercial activity, accommodation, dining, events, and supporting infrastructure together on a single, coordinated site — anchored by Phase I, the Cold Chain Logistics Park, and Phase II, the Standard Factory Building Industrial Park.

Together, the two phases occupy a combined land area of approximately 1,001,815 square meters, creating a substantial integrated development that combines logistics, industrial manufacturing, commercial facilities, accommodation, recreation, and supporting infrastructure.

Location Overview

Tanauan Logistics Center — On the Metro Manila ↔ Batangas Port Expressway Spine

Located midway along the SLEX–STAR Tollway corridor in the CALABARZON region, Tanauan Logistics Center offers direct access to Metro Manila (Port of Manila, ~65 km/1.5 hrs) and Batangas Port (~42 km/45 min). It sits within a ring of major industrial estates and PEZA economic zones — including FPIP, LIMA Estate, LISP III, and FIT — giving locators easy access to ecozone incentives, an established labor pool, and infrastructure already serving 200+ multinational companies in the area.

Strategic Overview

A Manufacturing & Cold-Chain Logistics Hub at the Center of the Region's Trade Routes

Tanauan Logistics Center in Barangay Talaga, Tanauan City, Batangas connects to 10 major export-import markets — including China, Japan, S. Korea, India, ASEAN, the Middle East, Australia, and the USA — through 2 international seaports within ~2 hours and 4 adjacent industrial estates. Positioned within Batangas’ premier industrial belt (FPIP, LIMA, LISP, FIT) and near PEZA economic zones, the hub is built for the “China +1+1” shift, offering warehousing, cold storage, and last-mile distribution across Luzon, the Visayas, and ASEAN from a single strategic node.

The Development

Two phases, one logistics backbone

Every element of the master plan is organized around three complementary components, designed to reduce dependence on any single visitor segment.

Phase I

Cold Chain Logistics Park

269,437

SQM Land Area
 

176,803

SQM Structural Area

Covers approximately 269,437 square meters of land, with a total identified structural area of approximately 176,803 square meters.

Phase II

Standard Factory Building Industrial Park

732,378

SQM Land Area
 

439,427

SQM Structural Area

Covers approximately 732,378 square meters of land. This phase focuses on standard industrial factory buildings together with roads, parking facilities, landscaping, and ancillary infrastructure.

269,437

SQM Phase I Land Area

732,378

SQM Phase II Land Area

1,001,815

SQM Combined Total

₱15.06B

Phase I Est. Budget

Renderings

The vision, rendered

Concept visualizations of the towers, entrance monument, plaza, and recreation areas across the development.

Location

Positioned in Batangas

Barrio Talaga, Tanauan, Batangas — an established industrial corridor with direct road access.

01

Barrio Talaga, Tanauan, Batangas

Site frontage along the Talisay–Tanauan Road.

02

Batch 1 land parcel — 456,415 sqm

Acquired parcel forming part of the combined site.

03

Batch 2 land parcel — 545,400 sqm

Additional acquired parcel adjoining Batch 1.

04

Integrated site infrastructure

Internal roads, parking, and landscaped connections between both phases.

05

Power infrastructure on-site

High-voltage transmission lines run directly through the property.

Investment Snapshot

A phased industrial investment

Figures summarized from the project’s cost breakdown; full detail is available in the downloadable project profile.

 

What the site brings together

Cold-chain & industrial in one master plan

Reduces logistics friction between storage, manufacturing, and distribution.
 

Mixed-use support facilities

Office towers, residences, dining, and event space alongside industrial operations.
 

Scaled for growth

Over 1,000,000 sqm combined land area across two coordinated phases.
 

Batangas industrial corridor

Positioned within an established logistics and manufacturing region.
 

Recreation & amenity infrastructure

Basketball courts, landscaped corridors, and event/gathering areas for the workforce.
 

Project Component & Approx. Area / Value

269,437 sqm - Approx. Area / Value

Phase I — Cold Chain Logistics Park (land)

176,803 sqm - Approx. Area / Value​

Phase I — Total structural area

732,378 sqm - Approx. Area / Value​

Phase II — Standard Factory Building Industrial Park (land)

439,427 sqm - Approx. Area / Value​

Phase II — Standard industrial factory buildings

29,295 sqm - Approx. Area / Value​

Phase II — Ancillary facility buildings

1,001,815 sqm - Approx. Area / Value​

Combined land area, both phases

Phase I Estimated Construction Budget

₱15,056,834,896

What the site brings together

Cold-chain & industrial in one master plan

Reduces logistics friction between storage, manufacturing, and distribution.
 

Mixed-use support facilities

Office towers, residences, dining, and event space alongside industrial operations.
 

Scaled for growth

Over 1,000,000 sqm combined land area across two coordinated phases.
 

Batangas industrial corridor

Positioned within an established logistics and manufacturing region.
 

Recreation & amenity infrastructure

Basketball courts, landscaped corridors, and event/gathering areas for the workforce.
 

Site Composition

More than warehousing

The master plan layers commercial, residential, and recreational infrastructure directly into the logistics footprint.

 

Cold Chain Warehouse

Dedicated cold-chain storage facilities anchoring Phase I logistics operations.

 

Office & Residential Towers

A 12-storey office building and 12-storey apartment building supporting on-site operations.

 

Dining & Events

A 5-storey lobby, banquet hall, restaurant, exhibition space, and leisure dining building.

 

Standard Factory Buildings

439,427 sqm of standard industrial factory space across Phase II.

 

Project Documents

Explore the full project profile

Download the complete documentation for detailed cost breakdowns, construction schedules, cash-flow projections, and zoning certifications.

 

Presentation Deck — 01

Full concept presentation with project overview, phase breakdown, and gallery renders.

Presentation Deck — 02

Alternate formatted deck covering the same project scope and site details.

Presentation Deck — 03

Website-style walkthrough deck with site plan, phase details, and portfolio gallery.

Peza Proposal for HSBC