“Your Business Solutions Provider. Together, We rise”

San Fernando Port, Cebu

/

/

San Fernando Port

Project Facts

Location

Brgy. Sangat, San Fernando, Cebu

Total project area

274,339 sqm

Quay length

2,140 linear meters

Tenure

25 + 25 years renewable

Status

Proposed

Built for the next gateway to the Visayas.

A proposed international seaport with a reclamation component, export processing zone, ship-to-shore and gantry cranes, warehousing and a roofdeck solar system, about 32 km from the existing Cebu Base Port. It is identified as a priority project under Mega Cebu’s development strategy.

The port is intended to relieve congestion at the Cebu International Port by opening an alternative gateway for bulk, break-bulk, containerized and general cargo, with provision for car carrier and cruise ship docking.

Four Phases, One Port

Development is expected to run three to five years, with operations targeted to begin in the last quarter of Year 2 or the start of Year 3.

01

Causeway & Main Berthing

Causeway and access bridge, containment area, sheet piling, armor rock and the main berthing area.

02

Reclamation & Land Development

Reclamation, embankment, roads and drainage across the port footprint.

03

Secondary Berthing & Equipment

Secondary berths, port protection and amenities, and installation of port equipment.

04

Warehouses & Solar System

Warehouses, roofdeck solar system, administration building and supporting structures.

Why South Cebu

A second-class municipality of about 80,000 people with an established industrial base and progressive local government support.

32 km from Cebu Base Port

Located in the industrial south of the province.

Within 5 km of major industrial users

Including Steel Asia, Mabuhay Cement, APO Cement and Taiheiyo Cement.

9–12 m natural draft

Can be deepened to 15 m for vessels above 15,000 GT.

Adjacent to a proposed PEZA ecozone

Up to 60 additional hectares planned for expansion.

More Than a Berth

Cargo handling equipment, storage and power generation layered directly into the port footprint.

90

Warehouse units

1,000 sqm of storage per unit.

4

STS quay cranes

Rated at 60 to 80 tons capacity.

8

Rubber-tired gantry cranes

Supporting container yard operations.

Solar

Roofdeck solar system

On-site power integrated into warehouse roofdecks.